When The Npower PPA Letter Will Be Ready
The Npower PPA letter otherwise known as the place of primary assignment letter, deployment letter or acceptance letter, is the letter which contains the following informations below;
1) The Letter Heading: This carries the heading " N-POWER BATCH C (STREAM II) PPA DEPLOYMENT LETTER" with the Npower logo above it.
2) Place Of Primary Assignment Address: This is located at the top right corner of the PPA letter and contains the place of primary assignment address.
3) Body: This contains the congratulatory message which says:
"Congratulations
You've been successfully deployed to a place of primary assignment for the period of your N-Power batch c (stream II) programme.
4) Other Informations: Other informations on the PPA letter includes;
A) Official Use Only , "ACCEPTED" OR "REJECTED" BOXES
B) PPA Contact Person: This includes the Name, Phone Number, Email Address, Designation, PPA Address and signature, this section is to be filled by the assigned supervisor at your place of primary assignment.
5) Contact Informations: This includes the USSD code for Npower information*45665#, telephone number 018888340 and other contact details.
Image Credit: Efficiencyview.com |
The Npower PPA letter will be ready on the deployment page of the nasims self service portal after the Npower physical verification exercise have been completed, the Npower physical verification exercise is expected to end by 25th of June, Npower applicants that have completed their physical verification should start expecting updates on their deployment page after the Npower physical verification exercise, when the PPA letter is ready it has to be downloaded from the deployment page of the nasims self service portal, taken to the assigned supervisor at the Npower applicant's place of primary assignment and uploaded back to the nasims self service portal deployment page only after it has been signed and stamped by the assigned supervisor.
Image Credit: Nairaland.com |
Comments
Post a Comment